Generally, it is best to specify the original purpose of the building as the building type, and then modify the use-area type to reflect its current use. Select building type = "Education", use-area type = "Office." The building's construction characteristics are inferred based on building type, while usage parameters (including occupancy, lighting and equipment use, and hot water demand) are based on the use-area type.
There is effectively no limit to the number of building sets allowed in a single case if there is enough hard drive space. Currently, each building set occupies approximately 4.3 megabytes of space across all file types. Given adequate storage space, FEDS can be—and has been—used to model an entire community, city, or utility service area.
There is no real limit to the number of buildings that can be modeled in a building set. However, building sets are designed to model buildings that share similar characteristics. The more similar buildings are within a given building set, the more accurate the results will be.
Use the building type or use-area designation that best fits regardless of which list it is on. The building set classes were grouped this way to aid in the selection of common types, but either list may be selected.
FEDS project costing algorithms account for any materials, taxes, and labor costs applicable to a given retrofit measure. Additionally, 15% contractor overhead, 10% design cost, and 6% site level supervisory, inspection and overhead factors are applied, along with any multipliers specified on the regional costs screen under the financial options. Note that many of the cost factors reflect real regional variation, including labor rates, materials cost multipliers, and sales tax rates—with differentiation driven by the specified zip code. Each of these parameters are also able to be modified by the user, if appropriate.
The non-annual maintenance cost is used by FEDS to account for costs recurring on a non-annual basis, such as incremental equipment replacements and replacing failed lamps and ballasts. For example, the present value of the non-annual maintenance cost for lighting represents the present value of the total cost (including materials and labor) to replace the burned-out lamps and ballasts of a particular lighting technology over the course of the study period (generally 25 years).
FEDS employs the same standard life-cycle costing methodology and algorithms as the building life-cycle costing computer program developed by the National Institute of Standards and Technology.
The discount rate is the factor used to adjust (discount) future sums of money into the equivalent current year dollar amount. It can also be thought of as the interest rate or hurdle rate (i.e., the rate of return required by a company for it to undertake a project). FEDS uses the real discount rate, which has the effect of inflation removed. FEDS provides the current Federal real discount rate as the default, but the user may enter any discount rate appropriate for their projects. Energy service companies performing shared energy savings contracts typically require real rates of return in the neighborhood of 10 to 20%.
The global cost multiplier is an overall cost multiplier applied to the total project cost (including all materials, labor, taxes, overhead). It can be used to adjust all of the total project costs used in FEDS economic calculations. This could be used for such purposes as to account for special cost-impacting requirements of working at a facility with stringent security requirements or health and safety risks, or to assess the impact of varying costs on project economics.
On the bottom right of some input screens (windows, lighting, heating, cooling, hot water, and motors) is a check box labeled "replacement required". The purpose of this selection is to tell FEDS that this particular building component or technology must be replaced. Whether it has failed (for example, windows are broken, or the furnace has stopped working), or a replacement or upgrade is planned, checking this box will force a replacement to be evaluated and selected when the FEDS optimization analysis is run. If a replacement option is cost effective, FEDS will work as normal; however, if one is not, FEDS will still provide the recommendation even though it may not be otherwise cost effective. FEDS will still report the most cost-effective option and all of the standard details to help users make informed decisions. This option is also known as replace on failure economics.
FEDS project costs are based on industry averages and may not match the exact costs you will be charged. The end-use and technology multipliers are intended to enable the user to adjust for these discrepancies so that the costs used in the FEDS analyses are as close to actual as possible. The recommended approach would be to first enter any known cost data (such as, labor rates, tax rate, discount rate, etc.), and then run FEDS, generate reports, and see what types of projects are coming up. Compare the project costs to actual known costs or bids for similar projects of that type. If any of the technology costs are grossly high or low, adjust them appropriately with a technology multiplier. Rerun FEDS to see if the same technology is being selected, and make sure that the costs more closely represent what the anticipated cost to complete the project. Because of the complex nature of the FEDS cost data, this iterative multiplier approach is the best way for users to modify project costs.