FEDS can be run on a machine connected to a network. In some circumstances FEDS can even be run remotely from a network computer or file share. However, because each network is different and interference and connectivity issues are possible, for the best performance (and to lower the risk of problems) it is recommended to run FEDS from a local machine.
Sometimes when the system or software crashes, certain files are locked in the system's memory which can cause strange or unstable behavior upon restarting. If this occurs, try quitting FEDS and restarting again. When closed properly, FEDS will tidy up the system resources and work properly the next time it is run.
The best way to check the accuracy of a model is to run FEDS without optimization and compare the annual consumption estimated by FEDS to actual metered data. To do this, go to "Exclude Building Sets" from the "Optimization" option on the "Simulation" screen. Make sure the "Pick Building Sets" method is selected then press the "Select All" button on the left side of the screen (under the list of building sets). After saving, go back and run FEDS. This will take from a few seconds to a couple minutes for FEDS to run the baseline load and consumption calculations for the buildings. Alternatively, running with the analysis type set to "Calibration" will accomplish the same thing. Once complete, review the *.txs report for the case and check the following data:
General case and building inputs on the first five pages (for any obvious input errors)
Energy consumption data by fuel type (page 7)
Electric peak demand value and time of occurrence (page 8)
Annual energy consumption by fuel type and end use (page 10)
Do not expect these to be identical to the metered data—this is a model representation of your buildings and even if extremely precise, will vary due to discrepancies related to actual vs. average weather, human behavior, and more. Therefore, achieving consumption values from FEDS that are within 10-15% of actual values suggests a reasonably accurate model. An experienced user who is knowledgeable about building energy systems and their interactions can successfully calibrate to a much tighter tolerance.
The inputs may be accessed within the operational and control technologies section of the ventilation inputs screen. A number of technology and control parameters are available for each. A two-position or continuously modulated damper is required for some of these options.
The air leakage into a building is determined from the inferred or user-specified infiltration rate. The infiltration rate is the amount of outside air entering the building during periods when the ventilation system is either not operating or not supplying outside air (i.e., times when building is not under a positive pressure).
A useful rule of thumb is that a full FEDS optimization run will take a couple minutes per building set. However, run-time depends on a number of factors, including computing resources, processor speed, size, and complexity of the case. The more buildings, use areas, and technologies being analyzed, the longer the FEDS run will take. Additionally, the presence and number of central energy plants and thermal loops will also impact run-time.
Conversely, a calibration run of the same case and computer takes only a few seconds (with additional time to generate the reports). This is because all building sets are excluded from optimization to help focus on the baseline energy results and aid in focusing on model quality assurance and calibration processes.
Installing FEDS will require approximately 1.7 GB of hard disk space. It is also important to have enough free disk space for case files. We recommend another 10-30 MB for this depending on the number and size of site models.
The blue arrows indicate inputs that are required for FEDS to run. If any of these cells do not have a value provided, FEDS will not be able to run and will produce an alert either upon saving a screen or updating inferences. Once a valid input value has been provided and saved, the blue arrow will disappear.
The lock symbol that appears next to many of the input cells indicates the value is inferable by FEDS and does not require an input. An open lock icon means the value is not locked and may be changed by FEDS when inferences are updated. The closed lock symbol represents inputs whose value is locked and protected from being changed when inferences are updated. A user may lock a value by either entering a value into one of these cells, or by clicking on an open lock symbol to lock the value that is currently present in the cell.
Input cells that do not have an icon next to them are for values not absolutely required for FEDS to run but are highly recommended. Values, such as the fuel price data and occupancy hours are extremely important (yet a value may not be required for each fuel or day type). Others, such as the energy consumption inputs and building/technology identifications, are not used by FEDS except for reporting and aiding the user in understanding the output.
In FEDS MBtu signifies Million British Thermal Units. Throughout the program, the 'M' prefix represents million or 106 (MW, MBtu), while 'k' represents thousand or 103 (kWh, kBtu).
The ventilation end use inputs screen contains very basic information on the ventilation motors (total capacity and efficiency). The fan motors button simply enables a user to specify more detailed motor parameters by accessing the underlying fan motor inputs screen. From here, information, such as speed, enclosure type, voltage, vintage, and number of motors can be specified. It is important to realize that if any of this information has been entered, the fan motor inputs on the main ventilation screen will be inaccessible without first deleting the more detailed inputs.